Peer-reviewed articles in scientific journals (45)

Researchers within LWE are marked in bold.

2013

Brege S., Stehn L., Nord T. (accepted). Business models in industrialized building of multi-story houses. Construction Management and Economics.

Engström D., Stehn L. (accepted). Design creating value for systems building of housing. Construction Innovation: Information, Process, Management 14.

*Hedgren E., Stehn L. (accepted). The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics.

Jansson G., Johnsson H., Engström D. (2013). Platform use in systems building. Construction Management and Economics, E-pub ahead of print.

Johnsson H. (accepted). Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics.

Johnsson H., Parida G. (2013). Prediction model for the load-carrying capacity of nailed timber joints subjected to plug shear. Materials and Structures, E-pub ahead of print.

*Meiling JH., Sandberg M., Johnsson H. (accepted). A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized construction. Construction Management and Economics, E-pub ahead of print.

Nordigården D., Rehme J., Brege S., Chicksand D., Walker H. (accepted). Outsourcing decisions – the case of parallel production, International Journal of Operations and Production Management.

*Nordin F., Lindahl I., Brege S. (2013). The applicability of integrated solutions offerings: Differential effects of product complexity. Journal of Relationship Marketing 12: 59-78.

Rehme J., Nordigården D., Brege S., Chicksand, D. (2013). Outsourcing to a non-developed supplier market: The importance of operational aspects in outsourcing. Journal of Purchasing and Supply Management 19: 227-237.

Parida G., Fragiacomo M., Johnsson H. (2013). Prefabricated timber walls anchored with glued-in rod connections: racking tests and preliminary design. European Journal of Wood and Wood Products 71: 635-646.

Tlustochowicz G., Johnsson H. (2013). Prediction model for the load-carrying capacity of nailed timber joints subjected to plug shear. Materials and Structures, E-pub ahead of print.

Tlustochowicz G., Fragiacomo M., Johnsson H. (2013). Provisions for ductile behaviour of timber-steel connections with multiple glued-in rods. Journal of Structural Engineering 139: 1468-1477.

2012

Ellström D., Rehme J., Björklund M., Aronsson H. (2012). Logistics cost management models and their usability for purchasing. Journal of Modern Accounting and Auditing 8: 1066-1073.

Engström S., Hedgren E. (in print). Sustaining inertia?: Construction clients’ decision-making and information-processing approach to industrialized-building innovations. Construction Innovation: Information, Process, Management.

Guan W., Rehme J. (2012).Vertical integration in supply chains: driving forces and consequences for a manufacturer's downstream integration. Supply Chain Management: An International Journal 17: 187-201.

Jensen P., Olofsson T., Johnsson H. (2012). Configuration through the parameterization of building components. Automation in Construction 23: 1-8.

Jönsson M., Andersson C., Ståhl J.-E. (in print). Conditions for and development of an information technology-support tool for manufacturing cost calculations and analyses. International Journal of Computer Integrated Manufacturing.

Lennartsson M., Björnfot A. (2012). Production resource management in the industrialised house-building supply chain. Journal of Engineering, Project, and Production Management 2:78-87.

Meiling J., Backlund F., Johnsson H. (2012). Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management 19:141-158.

Meiling JH., Backlund F., Johnsson H. (2012). Managing for continuous improvement in off-site construction: Evaluation of lean management principles. Engineering, Construction and Architectural Management 19:141-158.

Simonsson P., Björnfot A., Erikshammar J., Olofsson T. (2012). ‘Learning to see’ the effects of improved workflow in civil engineering projects. Lean Construction Journal 2012: 35-48.

2011

Bildsten L., Björnfot A., Sandberg E. (2011). Value-driven purchasing of kitchen cabinets in industrialized housing. Journal of Financial Management of Property and Construction 16: 73-83.

Jönsson M., Andersson C., Ståhl J.-E. (2011). Relations between volume flexibility and part cost in assembly lines. Robotics and Computer-Integrated Manufacturing 27:669-673.

Levander E., Engström S., Sardén Y., Stehn L. (2011). Construction clients’ ability to manage uncertainty and equivocality. Construction Management and Economics 29: 753-764.

Lu W., Olofsson T., Stehn L. (2011). A lean-agile model of homebuilders’ production systems. Construction Management and Economics 29: 25-35.

Sandberg E., Bildsten L. (2011). Coordination and waste in industrialised housing. Construction Innovation: Information, Process, Management 11: 77-91.

Tlustochowicz G., Serrano E., Steiger R. (2011). State-of-the-art review on timber connections with glued-in steel rods. Materials and Structures 44: 997-1020.

2010

Boqvist A., Claeson-Johnsson C., Thelandersson S. (2010). Passive house construction - What is the difference compared to tradtional construction? The Open Building and Construction Technology Journal 4: 9-16.

Brege S., Nord T., Sjöström R., Stehn L. (2010). Value Added Strategies and Forward Integration in the Swedish Sawmill Industry – Positioning and Profitability in the High Volume Segment. Scandinavian Journal of Forest Research 25:482-493. 

Lennartsson M., Björnfot A. (2010). Step-by-step modularity: a roadmap for building service development. Lean Construction Journal 2010: 17-29.

Lindahl I., Nordin F. (2010). The interplay of design and marketing: a general model. Irish Journal of Management 30(1): 1-20.

Malmgren L., Jensen P., Olofsson T. (2010). Product modeling of configurable building systems – a case study. Journal of Information Technology in Construction 15: 354-368.

Nordin F., Öberg C., Kollberg B., Nord T. (2010). Building a new supply chain position: An exploratory study of companies in the timber-housing industry. Construction Management and Economics 28: 1071-1083.

Tykkä S., McCluskey D., Nord T., Ollonqvist P., Hugosson M., Roos A., Ukrainski K., Nyrud A.Q., Bajric F. (2010). Development of timber framed firms in the construction sector - Is EU policy one source of their innovation? Forest Policy and Economics 12: 199-206.

2009

Ekholm A., Molnár M. (2009). ICT development strategies for industrialisation of the building sector. Journal of Information Technology in Construction 14: 429-444.

Johnsson H., Meiling J. (2009). Defects in off-site construction – industrialised timber housing. Construction Management and Economics 27: 667-681.

Nordin F. (2009). Trancendental marketing: A concentual framework and empirical examples. Management Decsision 47.

Persson S., Malmgren L., Johnsson H. (2009). Information management in industrial housing design and manufacture. Journal of Information Technology in Construction 14: 110-122.

2008

Brege S., Brehmer P.-O., Rehme J. (2008). Managing supplier relations with balanced scorecard. International Journal of Knowledge Management Studies 2(1): 147-161.

Höök M., Stehn L. (2008). Applicability of lean principles and practices in industrialized housing production. Construction Management and Economics 26: 1091-1100.

Höök M., Stehn L. (2008). Lean principles in industrialized housing production: the need for a cultural change. Lean Construction Journal 2008: 20-33.

Sandberg M., Johnsson H., Larsson T. (2008). Knowledge-based engineering in construction: the prefabricated timber housing case. Journal of Information Technology in Construction 13: 408-420.

2007

Andersson D., Brege S., Nordigården D., Rehme J. (2007). Outsourcing of wood-based component manufacturing: Driving forces found in Scandinavian companies. Journal of Forest Product Business Research 4, Article No. 7.

Björnfot A., Stehn L. (2007). Value delivery through product offers: A Lean leap in multi-storey timber housing construction. Lean Construction Journal 3(1): 33-45.