TECTONiSM and SCiNi – Investigating nickel mineral systems across scales
How do deformation and metamorphism influence the distribution, redistribution, and preservation of Ni-Cu (Co±PGE) mineralisation?
TECTONiSM and SCiNi address this shared research question at complementary scales in the Västerbotten nickel belt, commonly referred to as the "nickel line", in northern Sweden. TECTONiSM investigates the geological and structural framework of the mineral system, integrating regional and intrusion-scale observations with drill-core studies and microanalysis. SCiNi focuses on individual minerals and their microstructures, investigating how deformation and mineral reactions affect nickel distribution and how these changes can be constrained in time.
The projects have separate scientific scopes and budgets. Their complementary approaches connect the geological architecture of mineralised intrusions with the processes recorded by sulphide and silicate minerals.
TECTONiSM – Tectonic controls on Ni–Cu–(PGE) mineral systems
The project combines structural geological mapping, drill-core logging, geochemistry, high-resolution X-ray computed tomography and X-ray fluorescence scanning (XCT–XRF), and microanalysis. It also includes method development for automated identification and mapping of geological structures in computed tomography (CT) data. These observations and methods will contribute to an integrated conceptual mineral systems model to improve understanding of structural controls on mineralisation and support exploration in deformed terrains.
About TECTONiSM
- Project partners: Luleå University of Technology, Boliden, and Orexplore Systems AB.
- Project period: 1 December 2025–1 December 2027.
- Funding: TECTONiSM is supported by the Swedish Energy Agency through the Impact Innovation programme Swedish Metals & Minerals—an initiative of the Swedish Energy Agency, Formas, and Vinnova. The total project budget is SEK 4,804,660, comprising SEK 3,281,660 from the Swedish Energy Agency, SEK 1,241,000 from Boliden, and SEK 282,000 from Orexplore Systems AB. This funding supports TECTONiSM’s research and method development.
SCiNi – Sulphide and silicate characterisation in the Västerbotten nickel belt
SCiNi investigates how deformation, recrystallisation, and mineral reactions affect nickel distribution within and between sulphide and silicate minerals.
The project combines petrography, electron backscatter diffraction (EBSD), electron microprobe analysis, micro-X-ray fluorescence mapping, and Re–Os geochronology. It aims to distinguish preserved magmatic features from subsequent modification, evaluate nickel redistribution across microstructures, and constrain the timing of sulphide formation or modification.
About SCiNi
- Research team: Joel Andersson and Mathis Warlo, Luleå University of Technology.
- Proposed project period: September 2026–September 2029.
- Funding: SCiNi is funded by the Geological Survey of Sweden (SGU; 41%) and CAMM-CRM at Luleå University of Technology (59%). The total project budget is SEK 1,619,427. This funding supports SCiNi’s mineral-scale characterisation, chemical analyses, and isotope investigations. Its budget is separate from TECTONiSM.
Complementary research across scales
TECTONiSM provides the structural and geological context for interpreting mineralisation within the Västerbotten nickel belt. SCiNi examines the mineral-scale mechanisms and timing that help explain how mineralisation has been modified.
Together, the projects connect observations from regional geology and individual intrusions to drill cores, mineral grains, and microstructures. This relationship supports a more integrated understanding of how deformation and metamorphism influence nickel mineral systems and their exploration potential.
Contact
Joel Andersson
- Senior Lecturer
- 0920-493549
- joel.bh.andersson@ltu.se
- Joel Andersson
Updated: