
Test Coverage of mining waste
A planned and performed a test coverage with construction machines that can be used in remediation of surfaces that are a few hectares was conducted during the spring-summer 2016. The trials aimed to control the mixing, paving and compaction procedure in full scale.
An area of 2000 m 2 was covered during the test and showed satisfactory results. Quality control was conducted at blending and after packaging.
The experiments were funded by Boliden Mineral, Vinnova, SP Processum
Project participants: Ecoloop, LTU, Ramboll, Swerock
[http://www.processum.se/sv/spprocessum/projekt/projektlista/details/4/295/projektlista-4p00004-04-efterbehandling-av-gr%C3%A5bergsdeponi-med-mor%C3%A4n-gr%C3%B6nlutslamblandning-i-t%C3%A4tskikt]
[/research/subjects/Tillampad-geokemi/Forskningsprojekt/Utilization-of-Industrial-Residuals-for-Prevention-of-Sulphide-Oxidation-in-Mine-Wastes/Efterbehandling-av-gruvavfall-1.159396?l=en]
[/research/subjects/Tillampad-geokemi/Forskningsprojekt/Utilization-of-Industrial-Residuals-for-Prevention-of-Sulphide-Oxidation-in-Mine-Wastes?l=en]