Hoppa till innehållet

Novel Cost-effective capture of CO2 from Swedish CHP boilers

Publicerad: 21 januari 2019

• Designing and screening ILs with the help of theoretical models.
• Developing technology combined with mechanism study.
• “Proof-of-concept” via testing with real flue gas from a biomass CHP boiler.

Funding: Swedish Energy Agency

Partners: LTU Energy Engineering, RISE-ETC, Smurfit Kappa

Duration: 2020-2024

Contact persons: Xiaoyan Ji (LTU), Fredrik Weiland (RISE-ETC)