Operational risk assessment of transmission systems
It is important to avoid supply interruptions and large-scale blackouts at transmission level. This is done during transmission-system planning and during transmission-system operation.
During operation, the (N-1)-criterion is used by the majority of system operators. In this project, we aim to develop risk-based methods to be used next to the (N-1)-criterion. Those methods should be such that they provide information that can be used for transmission operation and operational planning. The methods will be applied to generic, example and realistic networks.
Project participants: Zunaira Nazir; Math Bollen; Manuel Alvarez.
Updated: