Evaluation of different energy recovery solutions for data centres
- A major problem with data centers is that the residual heat generated during the cooling process is rarely used because it often has low temperature and a large volume flow.
- In the research, possible heat recovery methods will be evaluated in detail where the goal is to evaluate which methods and techniques are possible to use and if they are energy efficient and profitable.
Funding: SEK 3.4 million (Subproject) (Total SEK 48.7 million), Swedish Energy Agency, Facebook, Hydro66, Ericsson, Node Pole, ABB, Tullverket, Fortlax, Acon, Vattenfall, Bodens Energi, Skellefteå Kraft, Luleå Energi, Umeå Energi, Skellefteå kommun, Luleå kommun, Piteå kommun, Bodens kommun, Älsbyns kommun, Region Norrbotten, Luleå University of Technology
Partners: Rise SICS North
Duration: 2018-2022
Contacts: Mikael Risberg